
Asia · Changxing Island, Shanghai, China
CHI Shanghai Shipyard
COSCO Shipping Heavy Industry
COSCO Shipping Heavy Industry (Shanghai) Co., Ltd — formerly CIC Changxing Shipyard — was built in 2004, covering a land area of 500,000 m² and a quay line of 4,242 metres.
Located at China's largest manufacturing base for marine and offshore equipment on Changxing Island, it is the first ship-repair company in the main channel of the Yangtze River, and the first Chinese ship-repair company certified by class DNV GL.
Technical facilities
Docks and capacity
Floating docks
5 entries| Dock | Length | Width | Lifting | Draft | Dock cranes |
|---|---|---|---|---|---|
| E Mei Shan | 410 m | 72 m | 85,000 t | 11 m | 2×15 t + 2×25 t |
| Jiu Hua Shan | 308 m | 50 m | 38,000 t | 8.5 m | 2×15 t + 2×25 t |
| Pu Tuo Shan | 247 m | 36.6 m | 22,000 t | 6.5 m | 15 t + 25 t |
| Pu Dong | 225.5 m | 38 m | 22,000 t | 6 m | 2×15 t |
| Bai Yun Shan | 190 m | 28 m | 11,500 t | 6 m | 5 t + 25 t |
- E Mei Shan
- Length
- 410 m
- Width
- 72 m
- Lifting
- 85,000 t
- Draft
- 11 m
- Dock cranes
- 2×15 t + 2×25 t
- Jiu Hua Shan
- Length
- 308 m
- Width
- 50 m
- Lifting
- 38,000 t
- Draft
- 8.5 m
- Dock cranes
- 2×15 t + 2×25 t
- Pu Tuo Shan
- Length
- 247 m
- Width
- 36.6 m
- Lifting
- 22,000 t
- Draft
- 6.5 m
- Dock cranes
- 15 t + 25 t
- Pu Dong
- Length
- 225.5 m
- Width
- 38 m
- Lifting
- 22,000 t
- Draft
- 6 m
- Dock cranes
- 2×15 t
- Bai Yun Shan
- Length
- 190 m
- Width
- 28 m
- Lifting
- 11,500 t
- Draft
- 6 m
- Dock cranes
- 5 t + 25 t
Data as published by the yard via UQP. Please confirm current availability and dimensions with our team before planning.
Contact through UQP
Planning a docking at CHI Shanghai Shipyard?
UQP is the Norwegian agent. We handle enquiries, specifications and follow-up with the yard on your behalf.
More in Asia
